5100 Marine Drive Condominium Association
5100 N Marine Dr. Phased Exterior Wall Repairs
Berglund Construction efficiently executed façade renovations, including concrete, parex, and EIFS repairs, along with thorough sealant replacement for borgata pokerwindows, curtain walls, and various joints, which enhanced the building’s overall integrity and overall aesthetic.
  • Project Type
    • Restoration
  • Status
  • Delivery Method
    • Lump Sum
  • Services
  • Location
    • Chicago, IL
  • Duration
    • 14 Months
  • Size
    • 46,000 sqft
  • Architect
    • Kellermeyer Godfryt Hart, P.C.

Borgata online casino

Berglund Construction contributed expertise in doing facade renovations for this project. They performed multiple repairs on all elevations of a multi-story building utilizing swing stages. Our team executed concrete repairs, including vertical surfaces, slab edges and the removal Borgata Casino gamesof davit anchors. We also undertook parex and EIFS repairs, which ensured a seamless finish with painting. A crucial aspect of their work involved sealant replacement, covering 100% of borgata pokerwindows, curtain walls, various joints: concrete to concrete, concrete to EIFS, and metal to EIFS, enhancing the building’s aesthetic appeal.