The Warwick Condominium Association
Pool Room Renovation
Berglund Construction undertook the removal of the existing tile floor, substrate, and finishes borgata casino reviewsat The Warwick Condominium pool.
  • Project Type
    • Restoration
  • Status
  • Delivery Method
    • Lump Sum
  • Location
    • Chicago, IL
  • Duration
    • 6 Months
  • Architect
    • Klein and Hoffman, Inc.

Borgata online casino

Berglund Construction performed the removal of existing tile floor, substrate, and finishes borgata casino reviewsat The Warwick Condominium pool. Concrete repairs were also performed on the deck and below the pool. Installation of new lights, wiring and power for pool & mechanical equipment were installed and Berglund also replaced the pool gutter, liner, piping, equipment and all spa equipment.